Laurence Gartside Advice for Your Bottleneck Isn’t Where You Think
By Jack Samuel
2 Views
Ask any plant manager where the bottleneck is and you will usually get a confident answer within seconds. Ask three managers and you may well get three different answers. Bottlenecks are easy to misjudge, and acting on the wrong one is one of the most expensive mistakes in manufacturing. This Laurence Gartside manufacturing consultant guide sets out five warning signs that your assumed bottleneck is not the real one, and how to confirm where your output is actually being limited.
If even one of these signs sounds familiar, it is worth pausing before the next improvement project or equipment request.
Why Bottlenecks Are So Easy to Misjudge
There are several reasons why a plant can be wrong about its own limit. The first is visibility. The oldest, noisiest or most expensive machine tends to attract attention, so people assume it must be the constraint. The second is history. A step that really was the bottleneck five years ago can keep that label long after it was fixed, because nobody has checked since.
Blame plays a part too. The area that receives the most complaints about late orders is often assumed to be slow, when it may simply be the place where lateness becomes visible. Local reports add to the confusion. A utilisation report that shows a machine running at a high percentage says nothing about whether that machine sets the rate of the plant. Finally, most people see only their own area. A supervisor in machining sees machining, and a supervisor in assembly sees assembly. Nobody sees the whole flow at once.
The result is a plant that confidently improves the wrong thing, then wonders why shipments have not moved.
Signs One to Three: What the Floor Is Telling You
Sign one: the most blamed area is not where work waits. Walk the line and look at where material physically accumulates. If the area everyone complains about has an empty floor in front of it, while a different step is surrounded by pallets and trolleys, the complaints are pointing at the wrong place.
Sign two: improvements elsewhere do not change shipments. Perhaps you sped up a machine, added an operator or reduced a changeover, and the plant’s output stayed exactly the same. That is a strong hint that the improved resource was not the constraint. A real improvement at the limit shows up in shipments quickly.
Sign three: the queue sits in front of a different step. Work in progress is a map of your system. It builds up in front of the resource that cannot keep pace. If your attention is on one step while the biggest pile of work waits at another, you have probably been looking in the wrong place.
How a Laurence Gartside Manufacturing Consultant Tests a Suspected Bottleneck
Confirming a bottleneck does not require complicated analysis. A Laurence Gartside manufacturing consultant review usually starts with observation over several days, covering different shifts and different product mixes. The aim is to answer a few simple questions with evidence.
Do downstream steps regularly wait for this resource? If so, it is a strong candidate. Is the resource ever idle because it has no work to process? If it often waits for work, it is not the constraint, because a true constraint always has work waiting in front of it. Where do expediting efforts cluster? The resource that supervisors chase and protect is usually telling you something.
The final test is a small experiment. Protect the suspected constraint during breaks, give it priority for material, or add temporary support, and then watch what happens to plant shipments over the following days. If output rises, you have found it. If nothing changes, you have saved yourself a much bigger mistake. If you would like a second pair of eyes on your own line, Contact Us and describe what you are seeing.
Signs Four and Five: What the Numbers Are Telling You
Sign four: the bottleneck seems to move around from week to week. A constraint that appears to wander often means one of two things. Either your product mix changes the load on different resources, or a policy such as batching or release rules is hiding the true limit. Either way, a moving bottleneck is a sign that you need to look at the system rather than one machine.
Sign five: reports show several resources as fully utilised. When many machines look busy, it is tempting to conclude that the whole plant is short of capacity. In reality, a resource can be busy producing work that the next step cannot absorb. Busy does not mean constrained. A genuine constraint is the resource that limits shipments, and only one resource at a time usually does.
If these signs sound familiar, treat your current assumptions about the bottleneck as a hypothesis to test, not as a fact to build projects on.
What to Do Once You Have Found the Real Constraint
Once you have confirmed the real limit, the sequence is straightforward. Protect it so it never waits for material, people, tooling or information. Reduce the time it loses to changeovers, stoppages and rework. Release work into the plant at the rate it can handle. Track plant-level shipments each week to confirm that gains at the constraint are reaching the customer.
Do not declare victory too early. Once the constraint improves, another step will take over as the limit, and your attention needs to follow it. Re-check regularly, especially after changes in product mix, staffing or demand.
Most importantly, hold off on large investments until you are certain that capital is required at the step that truly limits output. Knowing where the bottleneck really is often turns an expensive expansion into a modest set of improvements.
Conclusion
A confident answer about the bottleneck is not the same as a correct one. The warning signs are usually visible on the floor and in the numbers, but only if you are willing to question long-held assumptions. The Laurence Gartside manufacturing consultant approach is to test the evidence first, confirm the constraint, and only then decide where to invest effort and money. If you want to see how prepared your operation is to find and fix its true constraint, take the throughput readiness assessment and use the results to guide your next steps.
Frequently Asked Questions
How do I tell a bottleneck from a busy machine?
A busy machine is simply running a lot. A bottleneck is the resource that limits plant shipments. Look for work queuing in front of it and downstream steps waiting for it.
Can there be more than one bottleneck?
Usually one resource dominates at any given time, though several may be close. Start with the one that limits shipments the most and reassess after improving it.
Can a bottleneck be a person or a policy?
Yes. Skills shortages, shift patterns, batching rules and order release policies are all common constraints that look like machine problems from a distance.
How often should I re-check my bottleneck?
Re-check after any significant change in product mix, staffing, equipment or demand, and at regular intervals even when nothing seems to have changed.
Author details
-
Address: Laurence Gartside, Rowtons Training, Bristol, United Kingdom
-
Email: laurence@rowtonstraining.com
Related Reading
Top 10 Hidden Secrets About Business & Finance You Need to Know
Welcome to our in-depth exploration of Business & Finance. In an era defined...
Why Business & Finance is Transforming the Global Industry Landscape
Welcome to our in-depth exploration of Business & Finance. In an era defined...